Create an Account - Increase your productivity, customize your experience, and engage in information you care about.
Road Closures in the Borough of West Chester
South Darlington Street between Barnard and Miner Streets closed for gas work.
The following road closures are scheduled for today.
The two-lane turning lane at E Gay and N. Matlack will be closed all day. Traffic will be detoured to E. Gay and Walnut.
The 100 block of Wollerton Street and Woodbine Alley will be closed today between 8AM & 4PM.
The 400 block of Dean Street will be closed today between 8AM and 4PM.
100 block of E Nields – closed - PECO contractor
The 100 block of E. Union- closed – PECO
Reminder, the 500 blocks of W. Nields at Brandywine will be closed from 10PM-6AM and water service will be shut off
100 block of E. Union is still closed for a Gas Leak repair
Blacktop repairs starting in the 200 block of W. Lafayette.
100 block of E. Union is closed again today for a PECO Emergency gas leak repair. It will be closed all day
AQUA: - Tuesday, May 18, 2021 the 500 block of W. Nields at Brandywine Street will be closed from 9AM – 3PM
- Wednesday, May 19th the 500 block of W. Nields at Brandywine from 10PM – 6AM – water service will be shut down
PECO:- Tuesday, May 18, 2021 travel delays at Price and the 400/500 block of S. High Streets. Flaggers will be on site from 9AM – 3PM.
The 100 block of E. Union is closed for a PECO Emergency gas leak. It will be closed all day.
The 600 block of West Chestnut is closed all day for emergency PECO work.
200 block of E. Miner (Matlack to Railroad Alley) closed for AQUA water main work
300 block of S. Walnut (Union to Barnard) and the 100 block of E Union (Matlack to Walnut) are closed for PECO contractor work
Prescott Alley (between N. High and N. Walnut Streets) will be closed on Friday, May 14, 2021 from 8AM – 4PM.
The 200 block of W. Lafayette will be closed for sewer connections from 8AM – 4PM on Monday, May 3, 20201. The contractor will work with local residents to provide access, however, delays can be expected.
Thursday, April 29 - S. High Street and Rosedale Avenue intersection from 9AM – 3PM for pole replacement. Flaggers will be on-hand.
The 200 block of W. Lafayette will be closed from 8AM – 4PM on Thursday, April 29, 2021 for gas main services. Emergency vehicles will have access. The contractor will attempt to work with residential access, however, detours and delays can be expected.
The 200 block of W. Lafayette will be closed to local traffic for two sewer connections from 8 AM – 3 PM. Emergency vehicles will have access.
PECO will be working in the 50 block of West Gay Street beginning Monday, April 26, 2021. This section of W. Gay Street will be closed to traffic from 7:00 AM to 4:oo PM Monday Through Friday. After 4:00 PM, W. Gay Street will be fully re-opened. It is anticipated that the closure will be in effect for 3 weeks (ending approximately May 14th).
Please be aware there will be travel delays on the 300 block of W. Marshall Street for a gas main installation from 8AM – 4PM on Wednesday, April 21, 2021. Flaggers will be on site, but you can expect some travel delays.
Hogue Alley (between N. High and N. Walnut Streets) will be closed on Friday, April 16th from 8AM – 12 noon for a tree removal.
There will be travel delays Wednesday, April 14th and Thursday, April 15th on Prospect Alley between N. Matlack and Heston Alley from 7AM – 4PM. Please note the contractor will allow vehicles access to their driveway, but the alley will be closed to thru traffic.
Please expect travel delays, tomorrow, Tuesday, April 13 in Wilmont Mews Alley (between W. Market and W. Miner Streets) from 7AM – 3PM. Flaggers will be on site to assist vehicles.
On Monday, April 12, 2021, travel delays can be expected on the 600 block of W. Miner Street from 7AM – 3PM for PECO contractor work. Flaggers will be on-site to direct traffic
Asphalt repair work will occur on Monday, April 12, 2021 in the 50 block of Wilmont Mews Alley. Travelers may experience intermittent delays during the morning hours, however, the contractor will work to minimize those delays.
Night time closure of the 50 block of N. High Street from Market to Gay Street from 8PM to 6AM starting Sunday, April 11th thru Friday, April 16th and then again on Sunday, April 18th thru Friday, April 23rd. Please note, buses and emergency vehicles will have access.
Prescott Alley @ N Walnut is closed due to a PECO Installation.
The 50 block of Price Street will be closed until approximately 6:00PM. PennDOT has been notified.
A PECO contractor will be in the 50 block of Price Street tomorrow, Thursday, March 24, 2021 from 7AM – 3PM. There will be flaggers on-site, but travel might be delayed.
There will be travel delays tomorrow, Wednesday, March 23, 2021 in the 50 block of Price Street from 7AM – 3PM. There will be flaggers on-site, but travel might be delayed.
N. Church between W. Lafayette and W. Virginia is closed for AQUA water line work.
50 and 100 block of W. Marshall is closed to traffic for AQUA water line work
Please expect travel delays today, Monday, March 22, 2021 because of emergency PECO work in the 300 block of W Market Street. Travel might be delayed through Potter Alley and Wollerton Street (between S. New, S. Wayne and W. Miner). All vehicles will have access, just expect delays.
W. Prescott Alley will be closed to through traffic between N. Church Street and N. High Street from 7:30 am to 4:30 pm this Wednesday (3/17) through Friday (3/19).
Please be aware that S. Franklin Street between E. Barnard and E. Miner Streets is closed to all traffic for PECO work until work is complete.
Please be aware that there will be a gas service installation in the 40 block of Price Street tomorrow, Thursday, March 11, 2021. The road will be partially closed from 7AM – 3PM. Flaggers will be on-site to direct traffic, so motorists can expect some delays.
100 W Gay St lane restrictions flaggers on scene. (part of the PECO Harmony Project)
Closures & Restrictions today - W Ashbridge St closed between N Darlington & N Church. Setting new pole.
The 200 block of E. Nields Street is closed due to an emergency plumbing repair. No vehicles will be able to get through.
Please be aware that a PECO contractor is working in the 300 block of Price Street. Flaggers are on site, so you can expect some travel delays.
Week of February 15th – intermittent travel delays for test digs on East and West Gay Street for PECO’s Harmony Project. Please note these digs are weather permitting.
Monday, February 15, 2021 a portion of N. Franklin to 217 E. Evans Street will be closed for tree removal from 9AM – 12noon.
There will be travel delays sporadically on Gay Street from Monday, February 8 thru Friday, February 19, 2021 for the PECO Harmony Project. There will be lane restrictions from 7AM – 4PM around the manholes in the block. Flaggers will be on-site diverting vehicles into the one lane.
The Northbound lane between Union and Barnard will be closed and traffic will be diverted to the Southbound lane. Drilling is occurring at West Chester Recycling for a DEP compliance project.
Parking will be restricted on the East side of the 100 block of N. Church between Chestnut and Prescott Alley for at least two weeks. This area is being used as a staging area for PECO for the Harmony Project.
Friday, Jan 29 - a portion of the 700 block of Sharon Alley will be closed for a sewer repair (8am to 4pm). Vehicles will have access from E. Rosedale Avenue to the College Arms parking lot, but the Linden Street side will have no access.
Please be aware that the 100 block of E. Marshall Street between Matlack and Walnut will have lane restrictions today for Pole Replacements. Please note, flaggers will be on site and emergency vehicles will be permitted through with minimal delays.
The 500 block of S. High will have flaggers, so expect some travel delays while they work on the gas lines
Mon, Jan 19 - 100 block of E Virginia – travel delays
Mon, Jan 19 - 500 block of S. High – travel delays (flagger on site)
Monday, Jan 19 - 50 block of E. Barnard closed for a road repair
Please be aware of the following travel delays: 300 block of S High & 500 block of S High. Flaggers are on site directing the traffic flow, so travelers might experience some delays.
Friday: Travel delays possible in the 100 block of E. Virginia for a PECO gas service installation. (road will not be closed, travel lane will be restricted)
Friday: Prospect Alley will be closed from High to Walnut Street from 8AM – 11AM for a pole replacement. Please note, vehicles parked in Prospect Alley will be able to exit onto Walnut Street since the closure it at N High.
Friday: 500 block of S. High Street -PECO gas services (travel restrictions)
Thursday: 700 block of S. Adams (at E. Rosedale) – PECO Pole replacement
Thursday: 200 block of W. Gay (lane closed between N. Darlington to N. New) from 9:30AM – 12 noon – tree removal
Thursday. 200 block of N. Matlack (closed from E. Evans to E. Washington) from 8AM – 9:30 AM – tree removal
The 50 block of W Prescott Alley will be closed this afternoon and all day tomorrow, Tuesday, January 12, 2021 for PECO pole replacements. Vehicles will be able to access, however, they should expect delays.
50 block of E. Market will have lane restrictions for a tank removal, so travel might be delayed.
50 block of W Prescott Alley will be closed for new pole installation. The contractor will permit vehicles through, so travel might be delayed.
Aqua will be shutting down the 500 block of Sharpless St. until 3:00 pm.
Please be advised that AQUA is working at the intersection of N. High and W. Marshall Street today. The 50 block of W. Marshall will be closed to traffic. There will be some travel delays between the 400 and 500 block of N. High, however, flagger force will be on hand to direct traffic.
AQUA has W. Marshall Street at N. Church Street closed today.
West Marshall Street (between N. Church and N. New) will be closed today for the AQUA project.
The 300 Block of Granite Alley will be closed today 7am to 5pm.
Please be advised that PECO is replacing Electric poles through out the Borough for the next Month (January).
The 100 Block of West Marshall Street will be closed to all traffic this week due to water main installations.
Please use caution traveling on the 400 block of E Gay. PECO is installing a telephone pole and traffic is be diverted into one lane.
PECO has the 600 block of South Walnut closed until 3PM today.
PECO has the 50 block of East Barnard closed from Sharon Alley to Matlack Street for a gas leak. They road will be closed until approximately 3PM.
PECO has the 50 block of East Barnard closed from Sharon Alley to Matlack Street for a gas leak. The road will be closed until approximately 3PM.
The 50 block of W Marshall St. will have traffic delays today.
The 500 block of S Church is closed to traffic today.
The 400 block of East Barnard Street is closed this morning for emergency PECO work.
The 400 block of N. Walnut (ear the Hickman) will have possible delays in travel today. PECO crews are replacing gas meters and servicing gas lines.
N Franklin Street between Market St and E Gay St will be closed today, November 9, 2020 until 3PM for a pole replacement.
Spruce Alley between S. New and S. Darlington will be closed November 3rd and November 4th from 9AM – 3PM for PECO Pole replacement work.
Woodbine Alley (between W. Market and W. Miner) will be closed from 8AM – 2PM tomorrow (Tuesday, October 27, 2020) for a pole replacement.
Please use caution in the 100 block of W. Market Street due to re-pointing work at 122-126 W. Market Street from 8AM – 4PM through Friday, 10/23/2020.
The 50 block of South Wayne Street is closed due to an emergency gas repair by PECO.
On Friday, October 2, 2020 the 200 block of E. Market Street will have only one lane of travel from 8:00PM - 2:00 AM for Aqua work.
Ashbridge St (from High St to Church St) will be closed today.
N Darlington between Washington and Virginia will be closed throughout the day.
50 Block W Market St. - Sidewalk Restrictions
100 N Bradford Ave from 11am to 3pm – Road restrictions
600 block of W Chestnut possible delays (working in parking lane)
50 Block W Market Sidewalk Restrictions
300 block W Union St Lane Restrictions
N Darlington St Closed from Lafayette St to Virginia
The 300 block of Dean Street will be closed until 3PM for gas line work today.
50 block W Market Sidewalk Restrictions at Courthouse Alley to N Church.
400 block N High lane restrictions until 3PM
N Darlington Periodic Closures from Patton Alley to W Virginia Ave. until 3PM
100 block N Bradford Ave CLOSED between W Chestnut & W Gay until 12noon
600 block of West Chestnut will possibly have travel delays today, Thursday September 24, 2020 and Friday, September 25, 2020. Work is being performed in the parking lane, however, travel could be restricted at times throughout the day.
The 200 block of West Lafayette Street is closed due to a gas leak.
50 block E Gay – Sidewalk Restrictions
50 block N Darlington - Road Closed
50 block W Market -Sidewalk Restrictions
400 N High - Lane Restrictions
The 100 block of Linden will be closed until approximately 1PM today.
The 100 block of E.Nields will be closed until 3PM (open at Mechanics Alley)
The 50 block of W Ashbridge is closed until 3PM today.
Pedestrian Restrictions today in the 50 block of W Market for PECO Gas Work.
Prescott Alley between the Church and Mohawk Alley will be closed today between 7am and 3pm.
500 N Church St. closed from 7am to noon for a tree removal.
PECO 50 block W Market. Sidewalk Restrictions (Courthouse Alley Closed from Market to Church).
50 block S Church parking lane restrictions. Delays will be minimal.
The 100 block of Prescott Alley will be closed from 8AM – 12 noon. Emergency vehicles will have access if necessary.
There will be travel restrictions in the 400 block of West Rosedale until 3PM today. Flaggers will on sight.
The intersection Adams & 400 Miner will be closed to traffic until 3PM. They will allow vehicles out and the alley will be open to traffic
Please be aware that there is an emergency closure of the 50 block of Sharon Alley (between Cedar and E. Miner Streets)
Paving continues at E. Miner & S. Matlack until 3PM (Flaggers on site)
S Bolmar Street (between E. Market and E. Miner) will be closed until 3pm. Please note this will be closed to ALL vehicles including emergency vehicles.
The 100 block of E Miner and S Matlack will have delays due to milling and paving. Flaggers will be on site. 9AM – 2PM
400 block of W Rosedale will have travel delays due to construction. Flaggers will be on site. 9AM – 3PM
Milling will occur on Miner and Matlack Streets on Tuesday, September 8, 2020 and paving will occur on Wednesday, September 9, 2020. Temporary traffic control will be installed along with flaggers. There will be some traffic delays, but every attempt will be made to keep all traffic flowing on Matlack Street since Gay Street is closed.
The 100 block of Linden Street will be closed today and tomorrow. Vehicles will be able to travel through Mechanics Alley and cross over Linden.
There are lane restrictions in the 300 block of West Miner Street today.
North Everhart from Biddle to N Brandywine is closed today for an Emergency Water Repair.
Aqua work today and tomorrow - 421, 427 S Church Street and 301 through 309 S New Street.
Aqua work - 201 W. Lafayette Street today.
Please be aware that the 300 block of W Union is closed today to traffic for a PECO service call.
Please be aware the 50 block of S Church will have traffic restrictions. Southbound traffic will will be able to travel, however, there might be a slight delay.
Please be aware that PECO is performing work in the 200 block of W Gay Street. The street is closed all day until 3PM.
The 400 block of N. Darlington Street (Between W Biddle and W Lafayette) is closed today for a water line repair.
Lane Restrictions today: 50 block of North High Street.
Road Closure today: 100 Block of North Darlington Street.
Road Closure Today: 500 block of E. Barnard Street.
There are lane restrictions today in the 50 block of N High St.
The 500 block of E Barnard St. between Poplar and Worthington is closed today and tomorrow, Thursday, August 13th.
The 100 N Darlington Street is .closed between Gay and Chestnut
Closed Today: 600 block W Chestnut from Everhart to Bradford
Closed Today: 400 block N Darlington from Biddle and Lafayette.
Closed today: 100 block N Darlington from Gay to Chestnut
The 100 block of N Darlington (between Gay and Chestnut) will be closed to all traffic today until 3PM.
Please use caution in the 400 block of Harmony Alley today (between W. Gay and W. Market). The alley will be open to all vehicles, however, there might be some delays.
The 400 block of South Church Street is closed due to a gas leak. PECO is working on the problem and the road is expected to be closed until 1PM today.
Please be aware that over 600 people in the SW quadrant are still without power in the Borough. This has also impacted the traffic signals at New and Market Streets as well as Market and Darlington Streets. Public Works has placed temporary Stop Signs at the intersections while PECO works to restore this power.
Road Closure Today (9am to 4PM) - 100 Block of N Bradford (will be detouring)
Road Closure Today (9am to 4PM) - 400 block of S Church (between Price and Sharpless)
Road Closure Today (9am to 4PM) - 300 block of N Darlington (between Washington and Biddle)
Road Closure Today (9am to 4PM) - 50 block of N Darlington (between Gay and Market)
Restrictions: 300 block of E Market (between Brandywine and New)
CLOSURE: Gay Street (Matlack to New)
CLOSURE: 400 block of S Church (between Price and Sharpless)
CLOSURE: 300 block of N Darlington (between Washington and Biddle)
CLOSURE: 50 block of N Darlington (between Market and Gay)
Road Closure Today: 100 block W. Biddle (from Church to Darlington)
Road Closure Today: 300 N Darlington (Washington to Biddle)
Closures: 300 block of W Market (New to S Wayne) (9am – 3pm)
Restrictions: 400 block of N High (near Marshall) – 4 flaggers on site from (9am – 3pm)
Closures: 300 block of N Darlington (Washington to Biddle)
Closures: 400 block of S Church (9am-4pm)
Restrictions Today: 300 block of W Market St (between Wayne and New)
CLOSED TODAY: 400 block of S. Church Street.
CLOSED TODAY: N Darlington closed (Washington and Biddle)
Restrictions: West Market restrictions (8am -4pm)
CLOSED: West Washington from Wayne to New. (7am to 4pm)
CLOSED: N Darlington from Washington to Biddle (closed from 12pm – 4pm)
CLOSED: N Darlington from Patton to Washington (morning only)
Please note that the 200 block of N Darlington will be closed from Patton to Washington.
Please be aware that the 400 block of S. Church will be closed from 9AM – 3PM both Monday, July 27th and Tuesday, July 28th.
Lane restrictions today: Restrictions: N New from Market to Gay
CLOSED Today: W Market St from New to Wayne
CLOSED Today: N. Darlington St from Washington to Biddle
Restrictions: N Bradford (between Gay and Chestnut)
Restrictions: W Market (between New and Brandywine)
Closed: N Darlington St (between Washington and Biddle)
The 100 block of North Bradford will be closed and detoured tomorrow (July 21st)
The 400 block of Dean Street will be closed today.
Lane Restrictions: 600 block of N High between Biddle and Marshall
CLOSED: S Wayne between Market and Miner
CLOSED: N Darlington between Washington and Biddle
Lane Restrictions: W Market St. from Brandywine to New
CLOSED: S Wayne St. between Market & Miner
Closed: N Darlington St. between Washington to Biddle
Road Closures Today include S Wayne (between Market and Miner) & N Darlington (between Washington and Biddle).
Lane restrictions: W Market (between New and Brandywine
between Marshall St to Biddle St - lane restrictions FLAGGERS in place.
W Market St. from Brandywine to New St – Lane Restrictions FLAGGERS in place.
300 N Darlington St – CLOSED between W Washington & W Biddle St.
Lane restrictions on W Market between S Brandywine and New Street.
50 block of S Wayne between W Market and W Miner closed all day.
North Darlington between W Biddle and W Lafayette will be closed until 12 noon.
North Darlington between W Washington and W Biddle will be closed all day.
Wednesday, July 15th – 100 lock of N Bradford Avenue (lane restrictions w/a flagger)
Tuesday, July 14th – 400 block of Dean closed from 9AM – 12noon.
North Darlington Street between Biddle & Lafayette will be closed today.
There are lane restrictions today on West Rosedale between Church and Braford.
There are lane restrictions on West Market Street between Wayne & New today.
West Market Street between Wayne & Miner is closed today.
The 400 block of North Darlington Street is closed today.
Additional road closures for today include: S Wayne between W Market & W Miner & W Market lane restrictions between S Brandywine & S New
Road closures for today include:• N Darlington St between W Biddle & W Lafayette - 400 Hannum Ave (lane restrictions w/flagger) - S Wayne between W Market & W Miner & W Market between S Brandywine & S New
50 block of S Wayne between W Market and W miner is closed for PECO work until 3pm.
500 block of N Darlington will be closed most of the afternoon
Marshall & Darlington will be closed until 12noon
The following streets will be closed for portions of today: 500 Blk N Darlington - 300 Blk W Market - 200 Blk W Union - 500 Blk S Church & Marshall & Darlington. .
700 block of South New Street (between S Wayne and W Rosedale) closed today.
50 block of N Darlington (between W Market and Courthouse Alley) closed until 12noon.
The following streets are closed today for PECO & Aqua.N Darlington between W Marshall and W Virginia, the400 block N Church & the 300 block N Darlington.
Please be aware that N Darlington Street between Marshall and Virginia will be closed for AQUA work.
Road closure at the 600 block of N Darlington St for gas service install.
Signal Service will be replacing the damaged control box at E Gay & N Matlack - Lane restriction only
The 50 Block of North Darlington Street will be closed today.
Closure for water main: 50 block of N Darlington (between Market and Gay).
Lane Restrictions for paving: 50 block of E Gay, 100 block of E Market and 200 block of W Gay.
Please be aware that Friday, June 19, 2020 the 50 Block of N Darlington Street (between W Market and W Gay) will be closed to all vehicles.
Emergency Closure: 200 block of West Washington Street – total closure
Lane restrictions in the 400 block of West Market Street today.
The 300 block of North Darlington Street is closed today.
Darlington Street between Washington & Biddle is closed for AQUA work.
AQUA will be working in the the 50 block, 200 block and 300 blocks N Darlington St today for maintenance.
PECO has the northbound lane of the 100 block of N Bradford Avenue shutdown; they will be there until 3pm.
The 400 block of West Market Street will have lane restrictions until the end of June 2020 for PECO project.
The following closures and lane restrictions for today, Friday, June 12, 2020:West Washington between N New and N DarlingtonN Darlington between Patton Alley and W WashingtonPlease note: 400 W Market will have lane restriction until the end of June 2020 for PECO project.
The 50 block of North Darlington Street will be closed from 8AM – 4PM today.
Please be aware of the following closures or lane restrictions:• W Biddle at N Church closed for road resurfacing• 300 N Darlington Washington St from N New to N Darlington • 100 N Darlington St from Patton Alley to W Washington
N Darlington between Patton Alley and W Biddle is closed for Emergency repair.
The 300 block of West Washington between N New and N Darlington AQUA is closed for a water main install.
The 200 block of West Lafayette between N New St & N Darlington is closed for emergency repair.
Please be aware that the 400 Block of South High is one lane due to an AQUA Emergency Dig. Flaggers are on site.
Please be aware there is a Road Closure and Lane Restriction for road resurfacing:Northbound on N. Matlack at E. Chestnut no left turn onto Chestnut and Southbound on N. Matlack is closed at Evans Alley.
Please be aware, that the 200 block of Patton Alley is closed due to a downed tree. Crews are on site.
The 600 block of North Matlack Street is closed between Elizabeth and Ashbridge for a downed tree.
Three emergency road closures for downed trees blocking road:1) 50 block of Price Street2) High Street and Goshen Road3) E Washington and Matlack
AQUA is closing the 400 block of S Church today until 3PM.
The 100 block of E. Union is closed today for PECO gas work.
The following roads will be closed for AQUA repairs today between 8AM & 5PM. The 300 & 400 blocks of North Church Street & the 200 block of W. Biddle St.
Please be aware that PECO is installing poles on the 200 block of East Chestnut Street on Wednesday, June 3rd and Thursday, June 4, 2020. The road will be open with flaggers, however, there might be some delays when traveling this route.
The 300 block of N Walnut is closed. PECO is working on electrical wires.
The following roads will be closed today due to construction:100 block of E Union St. for a gas service install 9AM – 3PM &300 & 500 blocks of N Darlington St. for water main installations 9AM – 3PM
Please be aware the 200 block of E. Marshall (between Franklin and Matlack) will be closed until further notice for a downed tree. PennDOT has been notified. No vehicles will be able to get through.
Please be aware the 100 block of E. Union is closed today until 4PM due to gas line work.
The 200 block of W Union Street is closed until 3PM for a pole replacement today, May 18th.
Please be aware the 300 block of N. Church will be closed tomorrow (Wed., 5/13) from approximately 8:30 AM – 1:30 PM for gas service work.
Please be advised that the 100 block of W. Biddle (between Church and Darlington) is closed today and will be closed through Friday, 5/8/2020) for gas line work.
Please be aware there will be some lane restrictions on the 200 block of W Gay Street due to tree pruning today.
South High Street is shutdown between Ashbridge and Goshen Road due to wires entangled in a tree. - ROAD REOPNED AT 5:15 pm
There will be lane restrictions at the following locations for PECO base repair today:110 West Miner St112 West Barnard St512 South Walnut St204 South Walnut St
North High Street is closed from Virginia to Goshen Road. Wires are down and PECO has been alerted. The road cannot reopen until PECO makes repairs.
On Friday, April 10 there will be lane restrictions in the 300 block of N. Franklin for a tree removal. They will have traffic control so vehicles will be able to get by.
Lane Restriction today, Tuesday April 7, 2020 on the NW side of N. Matlack and E. Chestnut for PECO Emergency Gas Repair. Vehicles will be able to travel through street.
PECO will close East Union Street tomorrow, April 7 from South Matlack to Mechanics Alley from 8AM – 3PM.
Today - April 6: Lane restriction on W Washington and New Streets due to a telephone pole replacement. Vehicles will be delayed and restricted only when needed.
PECO will be closing East Union Street from Matlack to Mechanics Alley for a gas leak exploration today.
The 200 block of N Darlington between Patton Alley and W. Washington Street will be closed today (3/30/2020) from 9AM-3PM.
PECO gas work is being performed from 9A – 3PM today closing the following streets. West Washington from New to Darlington Sreets and Darlington from Patton Alley to Washington.
March 24 - The 300 block of North Darlington Street will be closed all day for AQUA work.
March 20 - the 200 block of N Darlington Street has been closed by PECO for the next 3 hours (until about 1pm).
March 19 - Emergency repair work is being performed by AQUA in 300 block of N Church. Closure is expected until 3pm.
March 19 - The 500 block of North Darlington Street will be closed today between Marshall & Virginia Streets as well as Virginia Avenue between Church Street and New Street for Aqua water main work.
March 16 - The 100 block of W Miner is being shut down for a gas emergency. The road will be closed for approximately 1 hour starting at 12 noon.
3-12-2020 400 block of E Barnard - partially closed with cars having thru access 3-13-2020 409 S Church - one lane closed, car will be able to go around 501 S Church - closed to Sharpless 3-16-2020 100 block N Bradford Ave Eastbound lane closed (cars will be detoured)3-18-2020 100 block N Bradford Ave Eastbound lane closed (cars will be detoured)
Monday, March 9 - Aqua is closing Sharpless Street today between S Wayne and Brandywine St from 9AM – 12 noon.
Please be aware that Aqua will be performing work at the intersection of S. Church and University Avenue on Monday, March 8, 2020 from 7:30M – 12noon. Church Street will be closed at Sharpless and University will be closed at Reynolds Alley. Only Emergency vehicles will be allowed through. WCU has been notified.
The Northbound lane of the 50 block of N. Matlack Street will be closed today, March 3rd as well as Middle Alley between N. Matlack and N. Franklin St. This closure will be from 9AM – 3PM.
The 200 block of W Barnard will be closed today from 9AM – 2PM today, March 2 for an emergency service call.
100 W Miner Street is closed due to a tree down. Public Works is working on the problem.
Thursday - February 27 from 7am to 4pmFor Sanitary Sewer Main Flushing50 block of North Matlack will be closedAt the intersection of Market and Matlack, the left lane will be closed
Friday - February 28 from 7am to 3pm - 100 block of South Church Street will be closed for a tree removal.
Wednesday - February 28 from 7am to 3pm - Gay Street, between Matlack Street and Walnut Street, the left lane will be closed for a sinkhole repair.
The 400 block of North Darlington Street will be closed until 9pm tonight for a emergency water main repair. Any questions can be made to Public Works at 610-696-5282.
The 400 block of North Church Street is closed until 3 pm today for water service repairs.
February 25 - 200 Block W Barnard Street 9 AM to 3 PM - Road Closed for PECO Gas Service.
February 24 - 200 Block W Washington 9 AM to 3 PM - Road Closed for PECO Gas Service.
February 18th – 21st – Bolmar Street at E Barnard and Bolmar Street at E Union will have lane restrictions with flaggers
Night Road Closures2/17-2/20From 8 pm to 6 amHigh Street will be closed from Market Street to Chestnut Street for utility mark outs for PECO.
PECO Road Patching that was delayed due to weatherRoads will be closed temporarily for 1-2 hours, no specifics on exact time- 100 Block West Barnard (Closed)- 300 Block South Darlington (Closed)
PECO will be installing a new gas main in the 50 block of North Church Street starting February 24th to service the new building at the corner of Church and Gay. The project is estimated to last approximately 2 weeks. Work hours will be Monday through Friday, 7 AM to 4 PM. There will be lane restrictions on Market Street as well.
** CANCELLED ** Today - February 11High Street between Chestnut and Market - Lane closures for utility markouts.
Road Closures - 2/11 through 2/13 (Weather Pending)• 200 Block Magnolia Street (Closed) • 300 Block South Darlington (Closed)• 100 Block East Virginia (Closed)• 100 Block West Barnard (Closed)
Road Closures - 2/13/2020• 600 Block West Chestnut Street (Lane Closure) PECO Gas Services
2/12/2020 Road Closures -• S New Street from Holly Alley to Union Street (Closed) PECO Gas Services• Holly Alley from Oak Alley to New Street (Closed) PECO Gas Services
2/11/2020- 100 Block S Darlington (total closure – alley access open) PECO Gas Services- 100 Block N Bradford (Parking lane blocked) PECO Gas Services
February 11, 2020• Walnut Street from Ashbridge Street to Clarke Street (Closed) Aqua Trench Repairs• Clarke Street from Walnut Street to Clover Alley (Closed) Aqua Trench Repairs• Clover Alley from Clarke Street to Ashbridge Street (Closed) Aqua Trench Repairs
February 7, 2020• S New Street from Holly Alley to Union Street (Closed) PECO Gas Services• Holly Alley from Oak Alley to New Street (Closed) PECO Gas Services
2/6/2019- 100 Block S Darlington (total closure – alley access open) PECO Gas Services- 100 Block N Bradford (Parking lane blocked) PECO Gas Services
Tuesday, February 4th from 9AM – 2PM Road Closures• 100 block of S New St• 400 block of W Chestnut
Monday, February 3rd from 9AM – 2PM – Lane Restriction – Intersection of Chestnut and Wayne – they will bring arrow to divert lane traffic.
The 100 block of Adams Street is closed going southbound from Chestnut Street today for a gas leak today, January 29.
January 28 - 100 block of Adams Street is closed going southbound from Chestnut Street today for a gas leak. They are not sure if it is going to last multiple days or not.
Week of January 27 - 9 AM to 3 PMGay Street starting at New Street moving east to Walnut Street, there will be lane closures for utility locations for PECO.
For the rest of the week, from 9 am to 3 pmStarting in the 300 block of west market and moving west, there will be lane closures to facilitate utility locations.
Friday from 9 to 3Hannum Avenue from Wayne to New will have a lane restriction for paving repairs.
January 7 through January 10:This message is from the Borough of West Chester. Spruce Alley will be closed tomorrow, January the 8th and Friday the 9th between the hours of 8 AM and 5 PM from Woodbine Alley to Darlington Street to re mediate a leaking oil tank. Local traffic WILL have access. You can contact Public Works at 610-696-5282 with any questions.
On January 13th and 14th North Walnut Street will be closed between Market Street and Middle Alley for a sanitary sewer lateral repair. Please contact Public works at 610-696-5282 with any questions.